Friday 10 December 2010

Rain

I don't know whether to cheer because it is raining or not! On one hand Iain can do blockwork as the temp is well over 4C and on the other hand the site is a quagmire! We have rivers, ponds, streams and mud lots and lots of mud.
So Iain is out in the rain and wind laying blocks, and tomorrow he'll be laying blocks and hopefully that will be the third layer finished. Then the hardcore can be packed into the middle.

Our mortgage company are happy with the valuation and have told us what our first payment will be and it's nearly enough to pay the kit manufacturer, GM Timber Systems. Just have to sign on the dotted line.

We're not in the caravan this week. Our portaloo supplier couldn't get here to empty the portaloo and even if they had it was frozen. Water pipes freezing, being in 2 feet of snow, having to put on more clothes to go to bed, trying to get out of the drive on foot (not a chance of getting the car down the drive), none of that bothered us, but we cannot manage without a toilet, so we've rented a holiday cottage in 'The Seaboard Villages' and are enjoying central heating, baths, washing machine and walks on the beach, inbetween coming up to site every day.
The portaloo supplier is coming on Tuesday so we'll be back in the caravan, but in the meantime I think I'll have another bath.