Saturday 7 August 2010

Visitors.

We've had family to stay for the last 2 weeks. Our son and fiancee with bump for the first week, they stayed in the caravan and of course had a go with the digger. Then my sister and partner with 3 poodles the second week in their tent.
The major event for the build is that the water is now fully connected, so we have mains water to our caravan. The electric will take a little longer, we've changed the route of the electric as the manager of the estate still hasn't signed the wayleave for Scottish & Southern Electric, so we're going through a neighbours garden and along the road to the gate. We (Iain) will have to run a cable up to the gate to connect to the meter. Iain has the barn all wired ready for when our electric is connected.
We still haven't got our building warrant but we can level the ground ready to dig the foundations. So hopefully won't be long now.
We've been on a couple of nice walks with 4 dogs and visited John O'Groats (twice). So had a nice couple of weeks playing tourist.